Bathroom Challenge

The brief was to design and co-ordinate a bathroom renovation with a difference. “To take a long relaxing bath was on the top of the list.” My client was recovering from a serious motor cycle accident. The two existing  bathrooms were unusable as as he was unable to use the small cramped shower and bath.  The shower needed to accommodate a shower seat, for the days when he didn’t feel steady on his feet, he could bathe in a seated position and use the hand held shower wand. Support bars were needed to be fitted to the bath, shower and WC to assist him. Both bathrooms were demolished and the central wall was moved  to create a more use-able space in both bathrooms.!